SCADA-Based Reliability Evaluation

Kelmarsh Wind Farm - 12.3 MW

Author

Jorge A. Thomas

Published

April 23, 2025

Kelmarsh Wind Farm

Project Overview

“Kelmarsh comprises six 2.05MW Senvion MM92 turbines. The Project was acquired from EON in December 2014 and was constructed in joint venture with Santander using balance sheet finance. Construction was completed in April 2016. It is now owned by Cubico Investments.”

(a) Kelmarsh Wind Farm

(b) Senvion MM92 turbine
Figure 1: Kelmarsh Wind Farm is located near Haselbach, Northamptonshire, UK.

Events Catalogue and Status

IEC category Stop Communication Informational Curtailment Warning
Requested Shutdown 77 0 0 0 0
None 21 744 168 0 2320
Forced outage 892 0 0 0 403
Full Performance 0 0 227877 0 1461
Out of Environmental Specification 93 0 90500 0 0
Partial Performance 0 0 0 37 9
Technical Standby 3094 0 56248 0 0
Scheduled Maintenance 818 0 0 0 0
Out of Electrical Specification 371 0 0 0 0
Note: Only "Forced outage" events with status "Stop" are considered for the evaluation, i.e., 892 events.

Reliability Parameters

Time / State Diagrams

Histogram of Failure Causes

Total

Per Wind Turbine

References

Iannone, Richard, and Michael Chow. n.d. great-tables: Make awesome display tables using Python. https://github.com/posit-dev/great-tables.
Inc., Plotly Technologies. 2015. “Collaborative Data Science.” Montreal, QC: Plotly Technologies Inc. 2015. https://plot.ly.
Mühleisen, Hannes, Mark Raasveldt, et al. 2025. “DuckDB: An Embeddable Analytical Database.” https://duckdb.org.
Plumley, Charlie. 2022. “Kelmarsh Wind Farm Data (0.1.0) [Data Set].” Zenodo. https://zenodo.org/records/8252025.
Vink, Ritchie, and contributors. 2025. “Polars: Fast Multi-Threaded DataFrame Library in Rust and Python.” https://www.pola.rs/.